Project's information
| Project's title | Study on construction of groundwater artificial recharge for provision of fresh water for desalination of salinized abstracted groundwater by a rural domestic water supply facility in Thai Binh province |
| Research hosting institution | Institute of Geological Sciences |
| Project leader’s name | Nguyen Van Hoang |
| Project duration | 01/01/2015 - 01/01/2016 |
| Project’s budget | 1,170,000,000VND |
| Classify | Excellent |
| Goal and objectives of the project | 1) Determination of feasibility of artificial recharge to upper Holocene aquifer for provision of fresh water for desalination of salinized abstracted groundwater by a rural domestic water supply facility in Thai Binh province; 2) Building of designs of two pilot of upper Holocene groundwater recharge and abstraction facilities in Thuy Truong and Thuy An communes, Thai Thuy district, Thai Binh province. |
| Main results | + Salinity intrusion in the Hoa river: 1) In the present sea level, the maximal length of sea water intrusion is 16.671km in the dry season; 2) At sea level rise of 50cm, 75cm and 100cm the maximal lengths of sea water intrusion are 18.059km, 18.510km và 18.959km, respectively (which are greater than the present sea level 1.388km; 1.839km and 2.288m, corresponding to 8.33%, 11.03% and 13.72%); 3) Between the three levels of sea level rise of 50cm, 75cm and 100cm the increase of the length of the salinity intrusion is about 450m.
|
| Novelty and actuality and scientific meaningfulness of the results | - With the fluctuation of the coastal sea water level in the Thai Binh and Hoa rivers' mouth, there are certain time intervals of the days and months when the river water has salt concentration less than 1g/l which can be utilized for socio-economic needs of the area, and the differences of the salt intrusion lengths for the sea level rise of 50cm, 75cm and 100cm area about 450m. |
| Products of the project | - General report on the results of the research; |
| Research region | The project would like to recommend Department of Science and Technology of Thai Binh province transfer the results to Thai Binh province's DoNRE and DARD to implement the investment of the facilities in Thuy Truong and Thuy An communes. |
| Recommendations | The following future science and technology studies: |